Further work will be done on the redesign of the Asterweg and the Docklandsweg intersection from Monday 27 July 2020 to approx. 1 June 2021 (previously 1 April 2021 and before that 25 December 2020). As a result, the driving lane will be inaccessible in both directions.
Because of extra work at the Docklandsweg junction, the project — and therefore the diversion of bus 38 — will continue until the beginning of June.

Bus 38 is being diverted in both directions: from the Ridderspoorweg via the Distelweg, Grasweg, Sausalitolaan and Spadinalaan to the Docklandsweg, and vice versa.

Suspended stops:
- Grasweg (Docklandsweg, both directions)

Temporary stops:
- 'Bundlaan' at the Grasweg (both directions, at the Bundlaan junction)

Cause

Street renovation

Effect

Route changed