Period

August 24, 2020 5:00 AM - November 21, 2020 1:00 AM

Lines
Explanation

From Monday 24 August at 05:00 to Monday 30 November at 01:00, following the track maintenance work on the Burg. de Vlugtlaan-Slotermeerlaan junction, part 4 of the maintenance work on the Burg. de Vlugtlaan bus and tram lane will be carried out. 

The stops in the direction of the centre are now being replaced.  Buses 21 and 80 travelling in the direction of the centre are being diverted, see separate announcement.

Tram 7 travelling in the direction of Azartplein is travelling its normal route, but some stops are being cancelled in turn. This will last until 21 November.

Suspended stops:
- Plein '40-'45 from Monday 24 August to Friday 4 September inclusive (previously: Sunday 30 August);
- Burg. Eliasstraat from Monday 14 September to Sunday 18 October inclusive;
- Burg. Fockstraat from Monday 19 October to Friday 20 November inclusive (previously: Sunday 15 November). 

Temporary stop:
- "Plein '40-'45"  on Burg. de Vlugtlaan, a little beyond the suspended stop.

Cause

Maintenance work

Effect

Stop(s) temporarily out of service